Project Name: Competitive Engineering Project for Upgrading and Renovation of Municipal Center for Disease Control and Prevention Laboratory - Upgrade and Renovation Engineering Sub project (EPC) Emergency Laboratory Furniture and Decoration Equipment System Material Procurement
Project Area: 1346.68㎡
Contract Amount: ¥800.00
Contracting Scope: The renovation scope includes the first floor elevator hall and corridor, the second floor elevator hall and laboratory, and partial renovation of the third floor of the building. Upgrade and renovate the fourth floor roof. The overall laboratory design integrates six subsystems including intelligent HVAC automation, information management, security prevention, and automatic fire alarm, forming an intelligent operation and maintenance system based on BIM, achieving remote dynamic real-time monitoring of the laboratory. Optimizing the environmental appearance with a focus on humanization, the overall use of warm tones makes the laboratory simple and bright. imultaneously utilizing large glass partitions to create a more open space and provide a more humane working environment for staff.